Review with the customer
When the planning is finished, show the customer:
1.
the final positions of the basestations with a walk-about; and,
2. the areas, if any, where the coverage requirements cannot be met.
Record floor plan information
Provide the planning information to the installer or the sales group. It is important that this
information be communicated in a clear and accurate way
.
Neatly transfer the information from the working copy to the clean copy of the floor plan. Use
the coloured markers to mark the cell boundaries and matching cell centres.
Record or attach the following information to the floor plans.
1. All areas needing coverage.
2. The location of the controller.
3. The total number of all basestations.
4. All the named cell centres (for example, 2C5) and their matching cell boundaries.
5. All the critical points that were used.
6. Any installation restrictions.
7. Any notes detailing the installation at a identified cell, recording any 12-channel
basestations.
8. The location of any basestation servicing outdoor areas, and the current restrictions
on the placing of those basestations.
9. Attach a completed traffic table with the floor plans.
Record provisioning record information
Record the following information on the applicable provisioning record.
1.
The date prepared
2. The Customer information
3. The Deployer information (name)
4. The cell numbers
5. The location of the basestations (cell centres)
Deployment review