User's Manual

Deployment tool 59
2 If required, install the extension arm fitting on the tripod. If not
required, go to step 4.
Place the extension arm fitting, shown in Figure 40 "Deployment
Kit 2 and carrying case" (page 64), onto the brass fitting on the
top of the tripod.
3 If required, secure the extension arm fitting.
Use the Allen key attached to the extender arm to secure the
extension arm fitting Allen screw.
4 Mount the extension arm on the tripod.
Place the brass end of the extension arm into the fitting, so that
the keying hole of the extension arm mates with the retaining
thump screw locking device of the tripod fitting. The thumb screw
locking device clicks into the keying hole of the extension arm.
5 Position the extension arm.
Orient the arm into the proper position. Secure the tripod fitting
and the extension arm thumb screw.
6 Affix the basestation to the extension arm.
Remove the basestation from the yellow case. Mount the
basestation onto the end of the arm. Screw the brass thumb
screw on the arm into the bottom of the basestation and secure
it in place with the grey lock thumb screw.
7 Position the antenna.
Rotate the antenna from its stowed position, against the body of
the basestation, to its upright operating position.
8 Position the basestation. The normal position is with the antenna
pointing upwards.
Secure the basestation with the arm thumb screw.
9 Mount the battery fixture on the tripod.
Remove the battery bracket, shown in Figure 37 "Deployment
tool battery details" (page 58), from the yellow case. Screw
the battery bracket onto the tripod caster brace, with the two
machine screws.
10 Mount the battery.
Pull the release pin on the bracket back and slide the battery
grooves on to the bracket. Ensure the bracket pin locks into the
battery.
11 Connect the basestation to the battery.
Nortel Communication Server 1000
SIP DECT Fundamentals
NN43120-123 01.07
6 January 2009
Copyright © 2008-2009 Nortel Networks
.