User's Manual

Conclusion 93
Conclusion
Careful planning and testing is required. Nortel recommends you simulate
every configured scenario, and analyze in detail the possible impact of
every scenario. An off-site testing procedure in a lab environment is
usually appropriate, to prevent loss of alarms (during change in image,
eKERNEL and other modules are stopped and all alarms can be lost).
Also, take into account that having a high-availability solution in
place affects change management. Changes applied to eKERNEL
must be synchronized, and (automatic) database upgrade changes
to Messenger_CFG.MDB must be handled manually by the system
administrator.
Finally, note that configuration changes with eCONFIG, eGRID, eWEB, or
another configuration tool can affect the total environment. For example,
a divert to another device does not work in a backup environment if
the destination device in not available, or the module is unavailable.
Therefore, due to the nature of such an architecture, and maintenance
issues and customer specific factors that are beyond our control, the
authors of eTH_HA cannot accept responsibility for malfunction of the
software.
Nortel Communication Server 1000
DECT Messenger Installation and Commissioning — Book 2
NN43120-301 02.01 4 June 2010
Copyright © 2003-2010 Nortel Networks. All Rights Reserved.
.