User's Manual

Launching FieldPoint Explorer 123
Table 2
Example 1a - FP-1000 module - Connect hardware modules (cont’d.)
Step
Action
Expand the IA Server with OPC item, and click FieldPoint to highlight the
section.
Right-click and select the option Add a com resource to this server... from the
pop-up menu. The following window appears:
5
Configure the comm resource.
Adjust (if necessary) the Port (COM1) and Baud Rate parameter, according to
your specific environment.
Refer to the FP-1000 module documentation for more information on the dip switch
settings of the module.
In the Advanced >>section, you can leave the default values for the timeout value
(200 msec) and the read interval (100 msec) unchanged, in most environments.
6
Check for attached modules.
Click Find Devices! to search for of attached peripherals. An intermediate window
appears while the program searches for devices.
When the process is finished, the attached modules are automatically configured.
This is illustrated in the following window:
Nortel Communication Server 1000
DECT Messenger Installation and Commissioning — Book 1
NN43120-301 02.01 4 June 2010
Copyright © 2003-2010 Nortel Networks. All Rights Reserved.
.