User's Manual
122 Install PC - Step 3 - National Instruments
• Table 4 "Example 1c - FP-1000 module - Adjust contact configuration"
(page 128)
• Table 5 "Example 1d - FP-1000 module - Save configuration" (page
131)
Table 2
Example 1a - FP-1000 module - Connect hardware modules
Step
Action
1 Attach the modules and power supply.
• Attach the available modules (FP-AI-100, DP-DI-300, FP-DI-301, FP-DI-330,
FP-DO-401) to the FP-1000 controller.
• Attach the power supply to the FP-1000 module. If connected correctly, the
power and ready lights on all modules show a green LED.
2 Connect the serial cable.
•
Look for an available COM port on the PC, and determine the resource name.
This example uses COM01 port.
• Connect the DB-9 serial cable to the selected COM port.
Note: Refer to the FP-1000 documentation for more information on setting baud rate
and address on the module. In the example, the factory default settings are used.
3
Launch the FieldPoint Explorer.
Click Start and choose Programs > National Instruments > FieldPoint 3.0 >
FieldPoint Explorer.
4 Add a comm resource.
Nortel Communication Server 1000
DECT Messenger Installation and Commissioning — Book 1
NN43120-301 02.01 4 June 2010
Copyright © 2003-2010 Nortel Networks. All Rights Reserved.
.