Specifications
37
User’s, Installation and Maintenance Manual
11.3 Assembly in tower factory
11.3.1 Top tower section
1. Install and adjust upper ladder section at the
top of the top tower section (see Fig. 1 and
installation drawing). Use 15 N·m torque for M8 and
50 N·m for M12.
2. Install the rest of the ladder sections from top to
bottom (see Fig. 2).
3. Install the rest platforms approximately every 9
m (see Fig. 3 and installation drawing).
4. Install the top mechanical stops and the top limit
plate (see Fig. 4 and installation drawing). Use 15
N·m torque for M8 and 50 N·m for M12.
11.3.2 Intermediate tower sections
1. Install and adjust upper ladder section at the top
of the intermediate tower section (see Fig. 1 and
installation drawing).
2. Install the rest of the ladder sections from top to
bottom (see Fig. 2).
3. Install the rest platforms approximately every 9
m (see Fig. 3 and installation drawing).
4. Install the electric cable arm support (see Fig. 5
and installation drawing).
5. (If platform switch
1)
on service lift is provided)
install a safe zone plate on the ladder at each
platform.
11.3.3 Bottom tower section
1. Install and adjust upper ladder section at the top
of the bottom tower section (see Fig. 1 and
installation drawing).
G
Fig. 1
Fig. 4
Fig. 5
Fig. 2
Fig. 3
F
1)
Optional for CE bucket type version.
Mandatory for CE full sliding door version.
Optional for AECO version.