F. Go up with the service lift to the next tower
section flange. Tighten all the ladder anchorage –
ladder bracket screws M12 above the cabin with a
torque of 12 N
•
m before the cabin is going up.
G. Repeat from C to F until all the tower sections
are installed.
H. With the cabin on bottom platform adjust the
bottom mechanical stop. It should be possible to
open the doors just above the fence railing. The lift
must stop before the cabin main structure hits the
bottom mechanical stop.
9.6 Electric adjustment on site
A. Install the controls boxes according to the
installation drawing.
B. Use cable strips to attach the fixed cable to the
tower internal:
9.7 Alignment labels installation
A. Stick the alignment label inside the cabin next to
the grid of holes at a height of 1,5 m from the floor
of the cabin:
B. There is an alignment label for each platform of
the tower. Stick label on ladder stile at a height of
1,5 m from each of the platforms.
10. Disassembling
In accordance with local authority regulations
disassemble in reverse order and dispose.
!
ATTENTION!
Tighten all the ladder anchorage -
tower bracket screws above the lift
with a torque of 12 N
•
m.
JOINTS BETWEEN
TOWER BRACKETS
AND LADDER
ANCHORAGES