Owner`s manual
12 Stove Installation (for qualified installers only) 
© Travis Industries  100-01260  4121205 
Standard Ceiling 
with a Factory 
Built Chimney 
Figure 7
Cathedral Ceiling 
with a Factory 
Built Chimney 
Figure 8
Chimney Cap
(See the section "Chimney 
Termination Requirements" 
for more details)
Chimney Sections
Minimum Air Space to 
Combustibles (See 
Chimney Manufacturer's 
Instructions)
Chimney Connector Sections
Follow the chimney 
manufacturer's instructions 
and clearances for roof 
penetrations. A storm collar 
and flashing are required 
(some require a radiation 
shield).
}
}
Follow the chimney 
manufacturer's instructions 
and clearances for floor 
penetrations. A ceiling 
support is required, an attic 
insulation shield is required 
where insulation is present.
Insulation
Minimum 15'
(4.57M) 
Maximum 33'
(10.05M)
Must Maintain Stove 
and Connector 
Clearances
Floor 
Protection
STOVE
Chimney Cap
(See the section "Chimney 
Termination Requirements" 
for more details)
Chimney Sections
Minimum Air Space to 
Combustibles (See Chimney 
Manufacturer's Instructions)
Follow the chimney 
manufacturer's instructions 
and clearances for roof 
penetrations. A storm 
collar, flashing, and 
cathedral-style chimney 
support are required 
(some require a radiation 
shield).
}
Minimum 15'
(4.57M) 
Maximum 33'
(10.05M)
Must Maintain Stove 
and Connector 
Clearances
STOVE
Chimney Connector 
Floor 
Protection










