Use and Care Manual
18
Finishing the Water Cooler Installation
10. After the installation of the water
line and filters is complete, plug the
power cord into a grounded wall
outlet and begin to use the machine.
Please allow the machine about 10-
15 minutes for the water to fill in the
tanks before use.
11. Be sure to dispense a little water
from both the cold and hot water
spouts (#8, #6) prior to turning on the
cooling and heating switches (#16,
#17) located on the back of the cooler.
15-20
min
Hot
Getting Started
9. Locate the Adapter with Valve that
is connected to the water source. Turn
this valve to the on position (parallel
to the PE Tubing) to allow the water to
flow through.