Specification Sheet
16
Finishing the Water Cooler Installation
4. Turn on the Valve that is located to the
left of the filters inside of the cabinet (the
on position is parallel to the PE Tubing).
5. After installation of the water line and
filter is complete, plug the power cord into
a grounded wall outlet and begin to use the
machine. Please allow the machine about
10-15 minutes for the water to fill in the tanks
before use. Continue on for instructions on
usage.
10-15
min
Getting Started