Full Product Manual
Water leakage.
If the 3 lights of heang light, cooling light and filter light are flashing,
there should be leakage.
Please check the PCB on the plate. Repair the
machine and dry the
PCB, and then power on again.
Pipe not connected properly.
Inspect the adapter to connect the pipe properly.
Water pipe and PE pipe bursng.
Replace the water pipe.
Please allow 15 minutes for the hot water to be heated. During this me
the red indicator light will be steady. The light will turn off when the
heang process is complete. Please allow 90 minutes for the cold water
to be cooled. During this me the green indicator light will be steady.
The light will be turned off when the cooling process is complete. If any
error occurs in the heang or cooling process, the indicator light will blink.
push buon
push buon
E: WATER PURIFIER
7
.