Use and Care Guide
16
Finishing the Water Cooler Installation
4. Turn on the Valve that is located to the
left of the filters inside of the cabinet (the
on position is parallel to the PE Tubing).
5. After installation of the water line and
filter is complete, plug the power cord into
a grounded wall outlet and begin to use
the machine. Please allow the machine
about 10-15 minutes for the water to fill
in the tanks before use. Continue on for
instructions on usage.
10-15
min
Getting Started