Use and Care Manual
10
5. Once the switches are in the on (I) position 
the heating indicator light (#2) and the 
cooling indicator light (#3) will turn on. It will 
take about 15 – 20 minutes for the hot water 
to heat to the appropriate temperature. It will 
take about 1 hour for the cold water to cool 
to the appropriate temperature.
6. When the water has reached the 
appropriate temperatures for hot and 
cold the indicator lights will turn o 
and the water is ready for use. The 
indicator lights will turn back on 
automatically when the machine 
needs to reheat or cool again.
7. To replace the bottle vertically, pull out 
the empty bottle with two hands. Using 
two hands place the new bottle of water 
vertically into the bottle supporter (#8).
Operation Instructions
Getting Started
15-20
min
1 hr
HotCold










