Specifications

For details about the detail process termination option, see 2.4 Setting up the event/action control environment
in the Job Management Partner 1/Automatic Job Management System 3 Configuration Guide 2.
(O)
Examine the cause of the error from the system error message that was output before or after the message, and then
take action. If you cannot determine the cause of the error, collect data and then contact the system administrator
(see 1.2.3 To the system administrators).
To continue processing, collect data and then restart JP1/AJS3.
There is no problem if this message appears when you execute jajs_killall.cluster command.
KAVT0950-I
The JP1/AJS2 monitor resource went online.
The monitored resource was placed online.
(S)
Continues processing.
KAVT0951-I
The JP1/AJS2 monitor resource went offline.
The monitored resource was placed offline.
(S)
Continues processing.
KAVT0952-I
OpenView Environment (maintenance-information) Setup skipped.
Setup of HP NNM Link was skipped.
(S)
Continues processing.
KAVT0953-I
OpenView Environment of JP1/AJS2 was installed normally.
HP NNM Link was installed normally.
(S)
Continues processing.
2. Messages
Job Management Partner 1/Automatic Job Management System 3 Messages 1
557