Specifications

Check whether the user who started JP1/AJS3 has superuser privileges or has logged on as a member of the
Administrators group.
Check whether the directory created during installation of JP1/AJS3 was deleted inadvertently.
Check whether the target host and JP1/AJS3 have started.
KAVT0094-E
The send source is invalid. (RequestPP=send-source) (maintenance-information)
Invalid data was received.
(S)
Discards the invalid data received, and continues processing.
(O)
Invalid data was detected in the port (jp1ajs2eamgr). The part may have been accessed incorrectly. Examine
the cause of the trouble.
KAVT0098-E
An error occurred in the processing of the time-out period of the start condition. (maintenance-information)
(AjsServiceName=scheduler-service-name, UnitID=unit-ID, ExecID=execution-ID, maintenance-information)
An error occurred during processing of the timeout period for the jobnet with start conditions.
(S)
Does not stop the jobnet with start conditions even after the period of time specified as the valid range has elapsed.
The jobnet with start conditions remains in the Now monitoring status.
(O)
Check the following, and then use the ajsname command with the -I option to identify the unit name from the
unit ID. Terminate the identified jobnet with start conditions forcibly. If the jobnet cannot be terminated forcibly,
an inconsistency has occurred in the management status of event jobs. Restart the manager and the agent on which
the start condition is executed.
Check whether the system resources are sufficient. Especially, check whether there is sufficient space on the
disk containing the directory for output of the wait information file.
Check whether the user who started JP1/AJS3 has superuser privileges or has logged on as a member of the
Administrators group.
Check whether the directory created during installation of JP1/AJS3 was deleted inadvertently.
Check whether the scheduler service has started.
KAVT0099-I
The start conditions stopped because the time-out period elapsed. (AjsServiceName=
scheduler-service-name,
UnitID=unit-ID, ExecID=execution-ID)
The start condition terminated because the time-out period elapsed.
2. Messages
Job Management Partner 1/Automatic Job Management System 3 Messages 1
501