Specifications
(S)
Terminates communication.
(O)
Check the environment for communication with the process.
KAVS4913-E
The port number could not be obtained. Confirm whether the service name is defined correctly.
An attempt to acquire the port number used by the scheduler service inter-communication control process has failed
(S)
Terminates the scheduler service inter-communication control process.
(O)
Check whether the service name and the port number for jp1ajs2gw are set correctly in the services file. If
the port number is correctly defined, memory or disk space might be insufficient. Terminate unnecessary
applications, and then restart the JP1/AJS3 service.
KAVS4914-E
The connection was reset while the process (host:host-name) controlling communication between scheduler
services was communicating with the process (host:host-name or IP-address) controlling communication between
scheduler services at the communication destination. : maintenance-information
The connection was reset while the scheduler service inter-communication control process was communicating with
the scheduler service inter-communication control process at the communication destination. The probable causes are:
• The JP1/AJS3 service on the destination host has stopped.
• An error occurred on the scheduler service inter-communication control process at the communication destination.
• The scheduler service inter-communication control process at the communication destination terminated
abnormally.
(S)
Terminates communication with the scheduler service inter-communication control process at the communication
destination.
(O)
If necessary, check whether the scheduler service inter-communication control process is running on the destination
host.
KAVS4915-I
The process (host:
host-name) controlling communication between scheduler services has restarted.
This message reports that the scheduler service inter-communication control process has restarted.
2. Messages
Job Management Partner 1/Automatic Job Management System 3 Messages 1
465