Specifications
(S)
Continues processing.
Note that you cannot use the execution order control for root jobnets between processing scheduler services until
the number of connections has dropped below the maximum.
Also note that either of the following occurs until a KAVS4918-I message is output.
• The connection-destination jobnet for which Synchro is specified for Exec. order method is placed into Ended
abnormally status.
• The jobnet connector is placed into Ended abnormally status.
(O)
After the KAVS4918-I message is output, re-execute the jobnet connector or connection-destination jobnet that
could not be connected.
In addition, re-estimate the value of the GWMAXCONNECTION environment setting parameter according to 2.2
Setting up the scheduler service environment in the Job Management Partner 1/Automatic Job Management System
3 Configuration Guide 2.
KAVS4908-E
The process(host:host-name) controlling communication between scheduler services failed to communicate with
a process (name:process-name) of the same host. : maintenance-information
The scheduler service inter-communication control process failed to communicate with a process of the same host.
For a process that is started for each scheduler service, the process name is output in the scheduler-service-
name:process-name format.
(S)
Terminates communication with the process indicated in the message.
(O)
Take action according to the Windows event log or syslog message that was output immediately before this message.
If no such message was output, check whether the process indicated in the message is running.
If you cannot correct the problem, contact the system administrator, and collect data (see 1.2.3 To the system
administrators).
KAVS4909-E
The process(host:
host-name) controlling communication between scheduler services failed to communicate with
the process (host:host-name or IP-address) controlling communication between scheduler services at the
communication destination. : maintenance-information
The scheduler service inter-communication control process failed to communicate with the scheduler service inter-
communication control process at the communication destination.
(S)
Terminates communication with the scheduler service inter-communication control process at the communication
destination.
2. Messages
Job Management Partner 1/Automatic Job Management System 3 Messages 1
463