Specifications
KAVS4904-I
The management process for the process controlling communication between scheduler services has terminated.
This message reports that the management process for the scheduler service inter-communication control process has
terminated.
(S)
Continues processing.
KAVS4905-E
The management process for the process controlling communication between scheduler services has terminated
abnormally (maintenance-information).
The management process for the scheduler service inter-communication control process terminated abnormally.
(S)
Cancels processing of the management process for the scheduler service inter-communication control process.
(O)
Take action according to the Windows event log or syslog message that was output immediately before this message.
If you cannot correct the problem, contact the system administrator, and collect data (see 1.2.3 To the system
administrators).
KAVS4906-W
The value (item-name), specified in the environment settings parameter (parameter-name), is out of range. The
default value (default) will be assumed and processing will continue.
Because the value specified for the environment setting parameter is invalid, the system assumes the default value to
continue processing.
(S)
Assumes the value indicated in default and continues processing.
(O)
Correct the value of the environment setting parameter, and then restart the JP1/AJS3 service.
KAVS4907-W
The number of connections for the process (host:
host-name) controlling communication between scheduler
services has exceeded the maximum value, and therefore the connection could not be made with the connection
destination host (host:host-name or IP-address).
The connection could not be established because the number of connections for the scheduler service inter-
communication control process has exceeded the maximum.
2. Messages
Job Management Partner 1/Automatic Job Management System 3 Messages 1
462