Specifications
KAVS0943-E
Cannot connect to job status notification process.: maintenance-information-1 maintenance-information-2
maintenance-information-3
The status report process could not be connected. The scheduler service cannot start.
(S)
Stops the scheduler service.
(O)
Use the messages that are output before and after this message to determine the cause of the unsuccessful connection,
and then take action.
Also make sure that the port number for job status notification is set correctly in the services file. The default
for the status notification port is 20245. Correct the cause of the error and then start the scheduler service.
KAVS0944-E
The error occurred during initialization processing of the job execution function(scheduler-service-name) :
maintenance-information
An error occurred during initialization processing of job execution control.
(S)
Stops the scheduler service.
(O)
Use the system error messages that are output before and after this message to determine the cause of the error, and
take corrective action. After correcting the error, restart the scheduler service. If you cannot determine the cause of
the error from the messages, collect data and then contact the system administrator (see 1.2.3 To the system
administrators).
KAVS0945-E
A scheduler daemon ended abnormally. (name: daemon-process-name, code: return-code, maintenance-
information-1, maintenance-information-2)
The scheduler service(daemon) terminated abnormally.
(S)
Terminates the scheduler service.
(O)
Use the system error messages that are output before and after this message to determine the cause of the error. Then
take action. If you cannot determine the cause of the error from the messages, collect data and then contact the
system administrator (see 1.2.3 To the system administrators).
2. Messages
Job Management Partner 1/Automatic Job Management System 3 Messages 1
273