Service manual
11.3.7 Installation of Condensate Pipe
1) The condensate pipe shall be kept an inclination 5~10
°for easier drain of the condensate water. To
prevent condensed dew, the connector of condensate pipe shall be heat insulated. (See Fig.11-11)
2) One condensate outlet is provided on the left and right side of the indoor unit respectively. After the
condensate outlet is determined, please use rubber plug to block the outlet on another side and fix
with tie strap to prevent leakage. Wrap properly with heat insulation materials.
3) The right condensate outlet is factory blocked by rubber plug.
管盖
冷凝水管
保温层
Fig.11-12
11.3.8 Installation and Connection of Wired controller
1) Firstly, select the install location. According to the size of communication wire for wired controller,
reserve a groove or cable hole for embedding of communication wire.
2) For open installation of the communication wire between wired controller (85 X 85 X16) and indoor
unit, you use 1# PVC pipe and set up an appropriate groove in the wall (See Fig.11-13(a)). For
concealed installation, you may use 1
#PVC pipe (See Fig.11-13(b)).
3) Both open installation and concealed installation
4) Fig. 11-14 shall be followed no matter for open installation or for concealed installation. Firstly, refer
to the spacing of mounting holes (60mm) on the base panel of wired controller and drill 2 holes (kept
level) in the wall. Then, knock a wood plug into each hole and fix the base panel of wired controller
onto the wall. After that, insert the communication wire into the control board. Finally, cover up the
front panel of wired controller.
Note:
When installing the base panel of wired controller, take special care on the direction of base panel. The
side with 2 notches must face downward; otherwise it will be impossible to mount the front panel
correctly.
Condensate Pipe
Heat Insulation Layer
Pipe Cover
96