Instruction Manual

27
TOP OF PLATFORM
CORNER #1
CORNER #2
CORNER #3
CORNER #4
SIDE A
SIDE B
SIDE C
SIDE D
1/2"
CORNER #1
START PLACING SKIRT APPROX.
1/2" FROM CORNER #1
BEFORE OVERLAPPING SKIRT AT CORNER #1
INSERT WEIGHT RODS IN WEIGHT ROD POCKET.
(1) FOR SIDE 'A' AND (1) FOR SIDE 'B'. WRAP SKIRT
AROUND CORNER AND ATTACH TO 'VERTICAL'
VELCRO STRIP.
AT CORNER #3, ON OUTSIDE SURFACE,
LOCATE OR CUT 1" SLOT IN TOP OF
WEIGHT ROD POCKET. INSERT RODS
INTO SLOT, (1) FOR SIDE 'C' AND (1) FOR
SIDE 'D'
HANGING TOE INDICATOR SKIRT
W/ WEIGHT ROD POCKET ON
BOTTOM
START SKIRT INSTALLATION AT
CORNER #1 ON SIDE OF
PLATFORM (AS SHOWN)
WRAP SKIRT CLOCKWISE AROUND PLATFORM
USING VELCRO TO ATTACH TO SIDE OF PLATFORM
'VERTICAL' VELCRO 'HOOK' V STRIP
ON OUTER SURFACE OF SKIRT
8"
(TYP)
TOE INDICATOR SKIRT
INSIDE VELCRO 'LOOP' MATERIAL
SEWN TO SKIRT
OUTSIDE VELCRO
'HOOK' MATERIAL
WEIGHT ROD
POCKET
STARTING EDGE FOR
CORNER #1
INSIDE VELCRO
'LOOP' MATERIAL
1/2"
Figure 12 Toe Indicator Skirt Installation
INSTALLATION INSTRUCTIONS