Instruction Manual

22
ANGLES:
+/- 1/32
.X +/- .1
.XX +/- .03
.XXX +/- .010
+/- 1/2~
BREAK ALL SHARP EDGES:
TOLE RANCES UNLESS
OTHERWISE SPECIFIED:
FRACTIONS:
DECIMALS:
ONE PLACE
TWO PLACE
THREE PLACE
.010 MAX. x 45~ CHAMFER
( = PLATFORM WIDTH + 2" )
(TYP.)
BASE ASSEMBLY (REF.)
PLATFORM ASSEMBLY IN
LOWERED POSITION (REF.).
CURB ANGLES (BY OTHERS).
BASE ASSEMBLY (REF.)
PLATFORM ASSEMBLY IN
LOWERED POSITION (REF.).
BASE ASSEMBLY (REF.)
1-3/4" DEEP X 3-1/2" WIDE RECESS FOR
CABLES (INTERNAL POWER UNIT), OR
HOSE (REMOTE POWER UNIT).
PIT
(TYP.)
SUMP AND / OR DRAIN
(INCLUDES 1/2" ALLOWANCE
ENTIRE LENGTH OF PLATFORM). CAN BE
MADE OF CONCRETE, STEEL OR OTHER
TOE GUARD CONTACT.
OF PIPE CHASE.
FLOOR TO TOP
FOR SHIMS OR GROUT,
LIFT LOWERED HEIGHT = 8-1/2").
(IF REQUIRED BY OTHERS).
PLATFORM ASSEMBLY (REF.)
ENTIRE LENGTH, ALONG THE LINE OF
RECESS
PLATFORM SUPPORT SHELF,
PROVIDED BY OTHERS,
MUST BE LOCATED UNDER BEVEL TOE
IMPACT RESISTANT MATERIAL (NOT WOOD).
GUARDS ON SIDE OF PLATFORM (ALONG
MUST WITHSTAND IMPACT LOADS OF
9000 LBS. DISTRIBUTED OVER THE
1" CLEARANCE
PIT WIDTH
1" CLEARANCE
PIT LENGTH ( = PLATFORM LENGTH + 2" )
7" MIN. FROM
9" PIT DEPTH
7-3/4"
3-1/4" OFF SET
1. ALL PIT WORK, CONDUIT, PIPING, CURB ANGLES, ETC. BY OTHERS.
RUN 3" DIA. PVC PIPE WITH LONG RADIUS SWEEP ELBOWS TO PROVIDE2.
PIPE CHASE FOR HOSE OR CABLES. RUN FROM PIT OT POWER UNIT
OR CONTROL LOCATION.
ADD PLATFORM SUPPORT SHELF TO PIT AS SHOWN ABOVE.3.
2
2
2
2
3
REV.
DRAWING NUMBER:
SIZE
NO. REVISIONS BY DATE
<2T
AQJ NO.
1 of 1
C
801-1030-7
3
1997
REFERENCE DWG.
DATE:
of Autoquip Corp.
without permission
design & construction
and cannot be used for
This drawing is the sole
PAGE:
DRAWING TITLE
JOB NAME:
APPROXIMATE WEIGHT:
C
property of Autoquip Corp.
L
C
L
C
Figure 10: Series 35 Pit Detail
INSTALLATION INSTRUCTIONS