Instruction Manual

(1) 1/2" EXTRA HEAVY
FOR COMPLETE DETAILS ON PIPE AND
EACH END OF DOCK WILL HAVE (1) PUSH-
BUTTON STATION.
NOTES:
INTO 24" CUTBACK
RECESSES COMPLETLY
BRIDGE IN RAISED POSITION
HINGE REACTION = ________ LBS.
(TYP. EACH BRIDGE)
PLUS DESIRED SAFETY FACTOR
CONDUIT SIZES & LOCATIONS, SPECIFICATIONS
AND NOTES, SEE DOUBLE BASCULE
BRIDGE PLAN VIEW.
______" (___' - _____") BRIDGE LENGTH
CONCRETE TO TAKE REACTIONS, PLUS DESIRED
WEIGHT PLUS 1.3 TIMES MAXIMUM LOAD. REINFORCE
REACTION IN CONCRETE EQUALS TOTAL BRIDGE
VELOCITY FUSES.
24" MIN.
CUTOUT
REMOTE POWER UNIT
GALVANIZED PIPES
(2) 3/8" EXTRA HEAVY
GALVANIZED PIPE
3/4" CLEARANCE
35 1/2"
8"
L
C
16" MIN.
15 1/4"
CUTOUT DEPTH
6" HIGH WHEEL CURBS
ON BOTH BRIDGES, BOTH
SIDES
1" CLEARANCE
____"
AND DOCK HEIGHT.
_____"
PLATFORM
DEPTH
SHIM AS REQ'D. TO
EQUALIZE BRIDGE
CHROME PLATED RODS AND
LIFTING CYLINDERS WITH
(TYP. BOTH ENDS.)
THIS POINT TO CENTER LINE OF TRACK.
CHECK RAILROAD CLEARANCES REQ'D FROM
SAFETY FACTOR. BY PIT CONTRACTOR.
INSTALLATION INSTRUCTIONS
Figure 10 Single Leaf Bascule Bridge – Elevation View
18