Specifications
Rack Installation
CP-20A Remote Panels are designed to fit in a standard EIA 19 in. (48.26 cm)
rack.
Once the CP-20A Remote is wired, follow the rack installation instructions
below. If linking multiple panels, see “Linking Multiple Panels” on page 10-5
before installing the panels in a rack.
Note: The optimum viewing angle for the screen is eye level.
To install the CP-20A Remote in a rack:
1. Insert the wired panel through the rear of the rack.
2. Attach the panel with front-mounting screws to hold it firmly in place (see
Figure 7).
Tip: For a multi-panel system, you may find it easier to install the top panel first
and move down from there.
3. Apply power to the panel(s).
4. Wait briefly for the system to establish communication with the remote
panel.
Execute a test switch to make sure the system is working properly (see Executing
Switches on page 2-2). If the system is not working properly, check all system
connections and retry the test switch before contacting AutoAssist (see Technical
Support, page 1-4).
Note: If the remote panel was not part of the original system, you will need to
load the configuration file to the CP-20A Remote; see page 8-2 for instructions.
10-4 CP-20A Control Panel Operation
Installing a CP-20A Remote
Figure 7: Place in rack and fasten with mounting screws
Installing Remote