Installation manual

Owner Installation Instructions GDO-9v2 Enduro™
25
Gen 2
Battery Backup Installation
Step 21.1 - Connect the Battery Back Up Kit
a. Disconnect power to the opener.
b. Remove screws and swing open the cover (Fig 44).
c. Mount the PCB support with two screws item # 13.
Secure the SBC0-2 Charger Board onto the PCB
support with three (3) screws item #14.
d. Feed the 2-wire battery harness item # 10 through
the grommet on the base plate and connect to
SBCO-2 battery charger board.
e. Feed charger harness from SBCO-2 battery charger
board to the control board and plug onto the 5 pin
connector marked “SBCO-2” on the control board.
f. Mount Battery Backup and secure with item 11 and
12.
WARNING: After Step 21.1(g) the opener may
become active (even when power is off). This is a
result of a residual charge in the batteries.
g. Connect battery harnesses item 5 and 10 together
(Fig 44).
h. Reconnect power.
44
fig
Step 21.2 - Testing Battery Back Up
a. Press either the OPERATE button or transmitter
to test the opener.
b. Whilst door is in motion, disconnect mains
power the door should continue to operate as
normal.
NOTE: Wait for the door to complete its travel.
c. Press the OPERATE button or transmitter to
activate the door.
d. Whilst door is in motion re-connect power. The
door should complete the cycle as normal.
Step 21.3 - Troubleshooting
If door stops or moves very slowly under battery
power, the batteries may be weak or have no
charge. Connect mains power and allow the
batteries to charge. This may take 24 - 48 hours to
reach maximum charge capacity.
Battery Backup Installation
GDO-9v2GEN2 User Manual v101.indd 25 15/11/2012 10:07:49 AM