Installation manual
KIT CONTENTS
ITEMS QTY
one piece c-rail assembly 1
See fig 3
C-RAIL CH-1P VP1 ASSY
P/N 01651
C-RAIL CH-1P VP1 ASSY
P/N 01651
C-RAIL CH-KD
3P VP1 ASSY
P/N 01650
ITEMS
QTY
GDO-9 SECTIONAL DOOR OPENER DRIVE UNIT---1
KEY RING TRANSMITTER PTX-4 PACK----------------1
(pack includes two keyring transmitters two
batteries and one wall mount bracket for ptx4 transmitter)
DOOR ATTACHMENT ARMS--------------------------------2
ACCESSORY PACK--------------------------------------------1
ITEMS QTY
C-Rail knock down assembly---------------1
FIG. 3
FIG. 4
FIG. 5
See fig 4
See fig 5
8
Note
chain in one piece rail has been tensioned by
the factory
Do not adjust the tension of the chain
IMPORTANT NOTE
If modification to the track length
required,adjustment must be made only from
power head side.