Instruction manual
 Owner Installation Instructions GDO-6v3 EasyRoller
®
27
Battery Backup Kit Installation
Step 23.1 - Connect the Battery Backup Kit
Turn off power to the opener and disengage 
motor.
Remove timing cover and light diffuser.
Remove cable clamp and screw (Fig. 40). Retain 
cable clamp for later use.
Mount the SBY-3 Charger Board on base and 
secure with four (4) Taptite ‘P’ M4 x 8 screws.
Secure lower left corner with cable clamp 
holding brown transformer wires.
Feed 4-Wire harness around timing assembly, 
through opening and plug into control board’s 
SBY-3 connector (Fig. 40).
Remove break away slot on timing cover. 
Feed 2-wire battery harness through slot and 
replace timing cover and secure in place with 
screws.
Mount Battery Backup Kit onto support chassis 
and secure right side screw fi rst (charger board 
side).
Position 2-wire battery harness neatly and secure 
left side of battery kit with cable clamp.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
WARNING: After Step 23.1(k) the opener may 
become active (even when power is off). This is 
a result of a residual charge in the batteries.
Connect battery harness together (Fig. 40).
Reconnect power and re-engage the motor. 
Step 23.2 - Testing the Battery Backup Kit.
Press either the OPERATE button or transmitter 
button to activate the door.
Whilst the door is in motion disconnect mains 
power. When mains power is cut, the Battery 
Backup Kit should respond to the shut down. 
The door should continue operating as normal.
NOTE:  Wait for the door to complete its 
travel.
Press OPERATE or a transmitter button to 
activate the door.
Whilst door is in motion, re-connect power. 
The door should complete the cycle as normal. 
Unplug the drive unit from mains power.
k.
l.
a.
b.
c.
d.
40
Fig
Battery harness
Cable clamp
Taptite screw M4x10
Battery backup
Control board 
DCB-03
Timing cover
SBY-3 Charger board
SBY-3
Break away slot on the 
timing cover and feed the 
battery harness through 
the slot










