Installation manual
1 Publication 1394-IN002B-EN-P — February 2004
Chapter
1
Installing Your 1394 SERCOS Interface System
Chapter Objectives
This chapter covers the following topics:
• Complying With European Union Directives
• Before Mounting Your System
• Unpacking Modules
• System Mounting Requirements
• HF Bonding Your System
• Planning Your Panel Layout
• Mounting Your 1394 SERCOS interface System
• Mounting Your External Shunt Resistor Kit
ATTENTION
!
The following information is a guideline for proper
installation. The National Electrical Code and any
other governing regional or local codes overrule this
information. The Allen-Bradley Company cannot
assume responsibility for the compliance or the
noncompliance with any code, national, local or
otherwise, for the proper installation of this system
or associated equipment. If you ignore codes during
installation, hazard of personal injury and/or
equipment damage exists.