SM425 INSTRUCTION MANUAL 4.0 PIPING
4.3.1 Blow Back Piping
This piping is required for blow back. The piping described below provides automatic blow back operation
when the “blow back start“command is selected at the converter.
Figure 4-11 Blowback Piping
The following parts are required for blow back piping.
• Blow pipe (to be prepared as illustrated in Figure 4-12.)
• Two-way solenoid valve: “Open“ when energized. (Found on the open market)
• Air set (recommended by Teledyne Monitor Labs, K9473XH / K9473XJ or G7004XF / K9473XG)
<Blow pipe manufacturing>
Manufacture the blow pipe as illustrated in Figure 4-12, and mount it on the high-temperature probe
adapter.