2012

Table Of Contents
To merge files from a vault into a current scene
1 Open an Autodesk Navisworks file.
2 Click Vault tab Access panel Merge
.
3 In the Select File dialog box, use the Files of Type box to select the
appropriate file type, and navigate to a vault location where the files you
want to add are located.
4 Select the required files, and click Open.
TIP To select multiple files, use SHIFT and CTRL keys.
Refresh a Vaulted File
You can retrieve the latest version of the currently opened file and its
referenced files from a vault.
If the local version is older than the version in the vault, the latest version is
copied from the vault to the local working folder, and the current file is
reloaded. If the working copy of a file is newer than the most recent version
of the file in the vault, you are prompted to chose either losing changes made
to the current working copy or to not get the latest version of that file.
To refresh a vaulted file
1 Click Vault tab File Status panel Refresh
. The opened file
and its referenced files will be updated to the latest version in vault if
appropriate.
Check a File into a Vault
You can use the Check In option on the ribbon to add files to the vault.
Use Check In when you are ready to check files into the vault for the first
time. In addition, use Check In when you are done working on an Autodesk
Navisworks file that has been checked out of the vault; check the file back
into the vault to store the changes with the new version history. Include a
comment with the file describing the changes made to this version of the data
when checking it in. The latest version of a file in the vault is the last version
Refresh a Vaulted File | 671