2012

Table Of Contents
3 In the TimeLiner window, the Tasks tab, right-click the required task,
and click Attach Current Search.
To attach multiple tasks to a selection set or a search set
1 If the TimeLiner window is not already open, click Home tab Tools
panel TimeLiner
.
2 In the TimeLiner window, the Tasks tab, hold the CTRL or SHIFT key
to select all required tasks.
3 Right-click the task selection, click Attach Set, and click the required
selection set or a search set.
To attach multiple tasks to a current selection
1 If the TimeLiner window is not already open, click Home tab Tools
panel TimeLiner
.
2 Select the desired geometry objects in the Scene View, or on the
Selection Tree.
3 In the TimeLiner window, the Tasks tab, hold the CTRL or SHIFT key
to select all required tasks.
4 Right-click the task selection, and click Attach Current Selection on
the shortcut menu.
TIP If you need to add additional items to an already attached task, click the
Append Current Selection option on the shortcut menu, otherwise any previous
task attachments will be overridden. If you made a mistake, right-click the task,
and click Clear Attachment.
Use Rules to Attach Tasks
Attaching tasks manually could take a long time. It is a good practice to either
use task names, which correspond to Selection Tree layers, or create selection
and search sets that correspond to the task names. If this is the case, then you
can apply predefined and custom-made rules to instantly attach tasks to objects
in the model.
642 | Chapter 14 Simulate Construction Scheduling