2012

Table Of Contents
To add tasks based on the Selection Tree Structure
1 If the TimeLiner window is not already open, click Home tab Tools
panel TimeLiner
.
2 In the TimeLiner window, the Tasks tab, right-click in the Task View,
and click Auto-Add Tasks on the shortcut menu.
3 Click For Every Topmost Layer if you want to create tasks with the
same names as each topmost layer in the Selection Tree.
Click For Every Topmost Item if you want to create tasks with the
same names as each topmost item in the Selection Tree. This can be
a layer, a group, block or cell, or geometry, depending on how the model
is constructed.
NOTE PlannedStart and End dates will be automatically created, starting from
the current system date and incrementing by one day for each subsequent end
and start date. The Task Type will be set to Construct.
To add tasks based on search or selection sets
1 If the TimeLiner window is not already open, click Home tab Tools
panel TimeLiner
.
2 In the TimeLiner window, the Tasks tab, right-click in the Task View,
and click Auto-Add Tasks on the shortcut menu.
3 Click For Every Set to create tasks with the same names as each
selection and search set in the Sets dockable window.
636 | Chapter 14 Simulate Construction Scheduling