TimeLiner Tasks
The Tasks tab can be used to create and edit tasks, to attach tasks to geometry
items, and to validate your project schedule.
You can adjust the Task View.
You can also add new user columns to the default column set. This is useful
when you import data from external project files that contain more fields
than TimeLiner.
To move a column
1 Open the TimeLiner window, and click the Tasks tab.
2 Position the mouse over the header of the column you want to move,
and press the left mouse button.
3 Drag the column header to the desired location, and release the left
mouse button.
To resize a column
1 Open the TimeLiner window, and click the Tasks tab.
2 Select the grid line at the right border of the column header of the
column you want to resize.
3 Drag to the right to enlarge the column, or to the left to shrink it.
TimeLiner Tasks | 633