2011
Table Of Contents
- Contents
- Welcome to Autodesk Navisworks Simulate 2011
- What Is New in This Release?
- How to Get Assistance
- Finding Information Using the InfoCenter
- Get More Help
- Learn the Product
- View the Product Readme
- Join the Customer Involvement Program
- Installation
- Quick Start to Stand-Alone Installation
- Prepare for Installation
- Install and Run Autodesk Navisworks Simulate 2011
- Move to Autodesk Navisworks from a Previous Release
- Install Autodesk Navisworks for Multiple Users
- Quick Start to Network Administration and Deployment
- Set Up a Deployment
- Installation Troubleshooting
- General Installation Issues
- How can I check my graphics card driver to see if it needs to be updated?
- When performing a Typical installation, what gets installed?
- Why should I specify the Project Folder and Site Folder?
- How do I share the Autodesk Navisworks settings on a site and project basis?
- Where are my product manuals?
- How do I register and activate Autodesk Navisworks?
- Deployment Issues
- Licensing Issues
- Networking Issues
- Uninstall and Maintenance Issues
- When adding or removing features, how can I tell what features get installed by default?
- Is it possible to change the installation folder when adding or removing features?
- When should I reinstall the product instead of a repair?
- Do I need my original DVD to reinstall my software?
- When I uninstall my software, what files are left on my system?
- General Installation Issues
- Quick Start to Stand-Alone Installation
- Quick Start
- Start and Quit Autodesk Navisworks
- Automatically Save and Recover Navisworks Files
- Command Line Options
- The User Interface
- Navigation with the Wheel Button
- Autodesk Navisworks Options
- Location Options
- Display Units
- Profiles
- Search Directories
- Gizmos
- Get a Whole-Project View
- Work with Files
- Native File Formats
- Compatible CAD Applications
- Use File Readers
- 3DS File Reader
- ASCII Laser Scan File Reader
- Bentley AutoPLANT File Reader
- CIS/2 File Reader
- DWG/DXF File Reader
- DWF File Reader
- DGN File Reader
- Faro Scan File Reader
- FBX File Reader
- IFC File Reader
- IGES File Reader
- Inventor File Reader
- JTOpen File Reader
- Leica Scan File Reader
- MAN File Reader
- Parasolid File Reader
- PDS File Reader
- Riegl Scan File Reader
- RVM File Reader
- SAT File Reader
- SketchUp SKP File Reader
- STEP File Reader
- STL File Reader
- VRML File Reader
- Z+F Scan File Reader
- Use File Exporters
- Manage Files
- View Scene Statistics
- Explore Your Model
- Control Model Appearance and Render Quality
- Review Your Model
- Use Viewpoints and Sectioning Modes
- Record and Play Animations
- Work Within a Team
- Share Data
- Work with Files
- Animate Objects
- Create Photorealistic Visualizations
- Simulate Construction Scheduling
- Autodesk Navisworks Reference
- Animation Export Dialog Box
- Background Settings Dialog Box
- Collision Dialog Box
- Convert Object Properties Dialog Box
- Culling Options Dialog Box
- Customize Dialog Box
- Default Collision Dialog Box
- Edit Key Frame Dialog Box
- Edit Link Dialog Box
- Edit Viewpoint Dialog Box
- Export Rendered Image Dialog Box
- File Options Dialog Box
- File Units and Transform Dialog Box
- Image Export Dialog Box
- InfoCenter Settings Dialog Box
- New Link Dialog Box
- Options Editor Dialog Box
- Publish Dialog Box
- Piranesi EPix Dialog Box
- QTVR Object Movie Settings Dialog Box
- Section Plane Settings Dialog Box
- Glossary
- Index
The Task View
The tasks are shown in a multi-column table, which provides some flexibility in how records are displayed. You
can:
■ Move or resize columns
■ Sort column data in ascending or descending order
■ Add new user columns to the default column set
TIP It is possible to move between entries in a manually editable task using the keyboard. Simply select a task that has
been set to be manually editable, and use Tab and SHIFT + Tab keyboard keys to move forwards and backwards
between fields. The keyboard can then be used to edit and set each entry where necessary.
The Task Hierarchy
Autodesk Navisworks TimeLiner supports a hierarchical task structure, as brought through from a link to your
scheduling software, for example Microsoft Project
™
see “Links Tab” on page 387 for more information). The
hierarchy can be expanded or contracted by clicking on the plus or minus sign, respectively, to the left of the
task.
The Task Icons
An icon is displayed to the left of each task name. These identify the current status of the task, with relation to
attached items and links to external schedules:
Task with no attached items.
Task with attached items.
Task with link synchronized to external schedule.
Task with link synchronized to external schedule, including Task Type.
Task with link to external schedule that is either broken or old (unsynchronized).
The Status Icons
Each task has its own Status identified by an icon, representing planned against actual relationships. Each icon
shows two bars. The top bar represents the Planned dates, and the bottom bar represents the Actual dates. If the
Actual start and finish dates are the same as the Planned start and finish dates, the bars are displayed in green.
Any variations between Planned and Actual dates are displayed in red. Missing Planned or Actual dates are shown
in grey.
Actual start and end dates equal Planned start and end dates.
Actual end date before Planned start date.
Actual start date after Planned end date.
Actual start date before Planned start date and Actual end date after Planned end date.
Actual start date before Planned start date and Actual end date equals Planned end date.
Actual start date equals Planned start date and Actual end date after Planned end date.
Actual start date equals Planned start date and Actual end date before Planned end date.
Actual start date after Planned start date and Actual end date equals Planned end date.
Actual start date before Planned start date and Actual end date before Planned end date.
Actual start date after Planned start date and Actual end date after Planned end date.
Actual start and end dates only.
Planned start and end dates only.
TimeLiner Window | 385