2011

Table Of Contents
4D Simulation. The TimeLiner tool helps to reduce delays and sequencing problems by enabling you to visualize project
activities.
Dynamic links to third party scheduling software provide accurate task data which can be mapped to your integrated
project model. With support for Planned, Actual, and Planned vs Actual dates you can analyze the viability of your
construction schedules. See
Simulate Construction Scheduling on page 383.
Visualization. The Presenter tool provides advanced visualization features enabling you to develop compelling movies and
imagery to present projects to stakeholders.
You can customize and configure every render aspect, including materials, lights, backgrounds, and rendering styles; use
environment backgrounds and lighting to create real-world effects; and choose from more than 1,000 built-in materials
to create an accurate, photorealistic look. See
Create Photorealistic Visualizations on page 349
Object Animation. The Animator features enable you to animate objects within your project model. Such animations can
be linked to tasks within TimeLiner so that you can simulate how various components are planned to be built. The Scripter
features further enable you to create interaction scripts that link animations to specific events and triggers to simulate
real-world behavior. See
Animate Objects on page 321.
| 7