2009

Table Of Contents
Adding Tasks Manually
To add a task:
1. Load your model into NavisWorks (see Opening Files if you need help).
2. Click TimeLiner on the Tools menu, and click the Tasks tab in the TimeLiner window.
3. Right-click anywhere in the task view, and click Add Task on the shortcut menu.
4. Enter the name for your task, and press Enter. The task is now added to your schedule.
Note:
Added tasks are automatically assigned the Actual start and end dates (the current system date
is used by default), which be modified. You can also assign the Planned start and end dates to
your tasks, if necessary.
Adding Tasks Automatically
Unlike manual tasks, which need to be attached to geometry in your model, automatic tasks will be
attached to the corresponding geometry as soon as they are created.
To add tasks based on the Selection Tree structure:
1. If the TimeLiner window is not already open, select Tools > TimeLiner from the menu bar.
TimeLiner Tasks
465