2009

Table Of Contents
The Task View
The tasks are shown in a multi-column table, which provides some flexibility in how records are displayed.
You can:
Move or resize columns
Sort column data in ascending or descending order
Add new user columns to the default column set
It is possible to move between entries in a manually editable task using the keyboard. Simply select a
task that has been set to be manually editable, and use Tab and Shift-Tab to move forwards and
backwards between fields. The keyboard can then be used to edit and set each entry where necessary.
The Task Hierarchy
NavisWorks TimeLiner supports a hierarchical task structure, as brought through from a link to your
scheduling software, e.g. Microsoft Project (see the Links tab for more information). The hierarchy can
be expanded or contracted by clicking on the plus or minus sign, respectively, to the left of the task.
The Task Icons
An icon is displayed to the left of each task name. These identify the current status of the task, with
relation to attached items and links to external schedules:
Task with no attached items.
Task with attached items.
Overview of TimeLiner
439