2009

Table Of Contents
Redline Tags are the exception to this rule. If a viewpoint is not already saved, then adding a tag
will automatically save a viewpoint. See Adding Redline Tags for more information.
Adding a redline to a saved viewpoint:
1. Go to a saved viewpoint, or a Clash Detective result with the Save Viewpoint check box selected on
the Results tab of the Clash Detective window.
2. Ensure the Redline Tools control bar is displayed as outlined above.
3. Type the thickness of the redlines into the Thickness edit box. The thickness applies to the redlines
you are about to draw and will not change any existing redline thicknesses.
Note:
Thickness does not affect redline text. This is a default size and weight.
4. To change the color of the redline (they don't have to be red!), click on the Color button to open the
standard Windows color chooser. This color applies to the redlines you are about to draw and will
not change any existing redline colors.
5. Click the icon with the desired type of redline to create it:
Choose the Text redline tool to add text over the viewpoint. Click in the main navigation
window where you wish to start entering text.
The redline text dialog will be displayed.
Enter the text you wish to add, then click OK to add the text, or Cancel to return to NavisWorks
without adding it.
Note:
Text can only be added in a single line with this redline tool. To display text on multiple lines, you
will need to write each line individually.
Reviewing
234