2009

Table Of Contents
end date.
Actual start date equals Planned start date and Actual end date before Planned
end date.
Actual start date after Planned start date and Actual end date equals Planned
end date.
Actual start date before Planned start date and Actual end date before Planned
end date.
Actual start date after Planned start date and Actual end date after Planned end
date.
Actual start and end dates only.
Planned start and end dates only.
The Simulate Tab
The Simulate tab enables you to simulate your TimeLiner sequence throughout the duration of the
project schedule.
The Playback Controls
Use the standard VCR buttons to step and play forwards and backwards through the simulation:
Rewind will rewind the simulation back to the beginning.
Overview of TimeLiner
324