2010
Table Of Contents
- Contents
- Welcome to Autodesk Navisworks Manage 2010
- Installation
- Quick Start to Stand-Alone Installation
- Prepare for Installation
- Install and Run Autodesk Navisworks Manage 2010
- Move to Autodesk Navisworks from a Previous Release
- Install Autodesk Navisworks for Multiple Users
- Quick Start to Network Administration and Deployment
- Set Up a Deployment
- Installation Troubleshooting
- General Installation Issues
- How can I check my graphics card driver to see if it needs to be updated?
- When performing a Typical installation, what gets installed?
- Why should I specify the Project Folder and Site Folder?
- How do I share the Autodesk Navisworks settings on a site and project basis?
- Where are my product manuals?
- How do I register and activate Autodesk Navisworks?
- Deployment Issues
- Licensing Issues
- Networking Issues
- Uninstall and Maintenance Issues
- When adding or removing features, how can I tell what features get installed by default?
- Is it possible to change the installation folder when adding or removing features?
- When should I reinstall the product instead of a repair?
- Do I need my original disk to reinstall my software?
- When I uninstall my software, what files are left on my system?
- General Installation Issues
- Quick Start to Stand-Alone Installation
- Quick Start
- Get a Whole-Project View
- Work with Files
- Native File Formats
- Compatible CAD Applications
- Use File Readers
- 3DS File Reader
- ASCII Laser Scan File Reader
- Bentley AutoPLANT File Reader
- CIS2 File Reader
- DWG/DXF/SAT File Reader
- DWF File Reader
- DGN File Reader
- Faro Scan File Reader
- IFC File Reader
- IGES File Reader
- Inventor File Reader
- JTOpen File Reader
- Leica Scan File Reader
- MAN File Reader
- PDS File Reader
- Riegl Scan File Reader
- RVM File Reader
- SketchUp SKP File Reader
- STEP File Reader
- STL File Reader
- VRML File Reader
- Z+F Scan File Reader
- Use File Exporters
- Manage Files
- Explore Your Model
- Control Model Appearance and Render Quality
- Review Your Model
- Use Viewpoints and Sectioning Modes
- Record and Play Animations
- Work Within a Team
- Share Data
- Work with Files
- Animate Objects
- Create Photorealistic Visualizations
- Simulate Construction Scheduling
- Locate and Manage Interferences
- Autodesk Navisworks Reference
- File Options Dialog Box
- File Units and Transform Dialog Box
- New Link Dialog Box
- Edit Link Dialog Box
- Edit Viewpoint Dialog Box
- Options Editor
- Default Collision Dialog Box
- Collision Dialog Box
- Convert Object Properties Dialog Box
- Culling Options Dialog Box
- Customize Dialog Box
- Customize Keyboard Dialog Box
- Edit Key Frame Dialog Box
- Publish Dialog Box
- Background Settings Dialog Box
- QTVR Object Movie Settings Dialog Box
- Export Rendered Image Dialog Box
- Image Export Dialog Box
- Animation Export Dialog Box
- Glossary
- Index
2 Type in a new name for the group, and press Enter.
3 Select clashes you want to add to this group, and drag them into the folder.
4 When you click the created clash group, the Item 1 and Item 2 panes show all the clashing items contained
within that clash group, and all corresponding clashes are shown in the Scene Area.
To group multiple clashes
1 On the Results tab, select all clashes you want to group together.
2 Right-click your selection, and click Group.
3 Type in a new name for the group, and press Enter.
4 When you click the created clash group, the Item 1 and Item 2 panes show all the clashing items contained
within that clash group, and all corresponding clashes are shown in the Scene Area.
To rename a clash group
1 Right-click the clash group in the Results View, and click Rename.
2 Type the new name, and press Enter.
Command entry: F2
To remove clashes from a group
1 On the Results tab, expand the required clash group.
2 Select all clashes you want to remove.
3 Right-click the selection, and click Remove from Group.
To ungroup clash results
1 On the Results tab, click the desired clash group.
2 Click the Explode Group
button.
Command entry: Explode Group
To change status of ungrouped clashes
1 On the Results tab, select the clashes requiring the change.
2 Click the drop-down button in the Status box, and select the appropriate status.
NOTE Multiple clashes can be changed by either holding down the Ctrl key whilst selecting individual clashes (the
last selected being shown in the Scene Area), or by holding down the Shift key and selecting another clash, thereby
selecting all clashes between the two including the first and last (again, the last selected being shown in the Scene
Area).
To change status of a clash group
1 On the Results tab, click the required clash group.
2 Click the drop-down button in the Status box, and select the appropriate status.
NOTE Changing status of a clash group changes status of all clashes in this group.
392 | Chapter 16 Locate and Manage Interferences