2009

Table Of Contents
Chapter 53. Reporting Clash Results
You can produce various Clash Detective reports. For example, you may need a report that will enable
planners to adjust the project schedule in their 3rd party scheduling software.
To create a clash report:
1. In the Clash Detective window, run the desired test (individually, or as a batch). If you run a batch
test, on the Batch tab, select the test you want to view the results for.
2. Click the Report tab.
3. In the Contents field select all the information you want to appear in the report for each clash result.
This can include Smart Tag properties relating to the items involved in the clash, how to find them in
the standard selection tree from root to geometry, whether images or simulation information should
be included, and so on.
4. In the Include Clashes field, select the check boxes for clashes you want to include in the report
(based on clash status).
5. Select the type of report from the Report Type drop-down list:
Current Test creates a single file for the current test.
All Tests (combined) will create a single file containing all results from all tests.
525