5.0
It is possible to override the Start and End dates that the simulation runs between. Checking the Override
Start / End dates check box un-greys the date boxes and enables the setting of start and end dates to
suit, allowing a small sub-section of the overall project to be simulated. The dates will be shown on the
Simulate
391