5.0
• Add Comment. Choose this to add a comment to the task. See the section called "Commenting" in
the chapter called "Reviewing" in the JetStream Roamer book for more information on adding
comments.
• Rename. Choose this to rename the task. When the text field becomes active, enter the new name
then press Enter to save it.
TimeLiner tasks can be sorted on a per-column basis. This can be done in two ways.
Firstly columns can be sorted by left-clicking on the column headers. Clicking multiple times will alternate
the sort between ascending and descending, treating a-z, 0-9, Monday-Friday etc. as ascending.
Tasks can also be sorted by right-clicking on the column heading and clicking Sort.
Columns can then be sorted by selecting Ascending or Descending.
Maintain Hierarchy, that is, keeping contained tasks inside their containers, is on by default, and shows
in this menu with a tick next to it. When sorting with Maintain Hierarchy selected, tasks are sorted first by
container, then by container contents.
If it is not required to maintain the hierarchy in the sort, then Maintain Hierarchy can be un-ticked.
Sorting without the hierarchy maintained will treat the tasks and containers as un-connected items and
sort everything together.
All columns can be sorted in this manner. If Sorting is selected on the Status column, activities will be
sorted from early through to late start for ascending, and vice-versa for descending.
Note
You can use multi-selection (i.e. holding down Shift or Ctrl) to perform most commands on
several tasks at once. For example, should you need to delete all tasks, select the first task, then
hold down Shift and select the last task, then press Delete.
39.2. Select Link Dialog
You can Relink a task to an external schedule, by right-clicking on the Task and selecting Relink. When
doing this, you will be prompted to select which Link to use, as your project may be linked to multiple
schedules.