5.0
2. Select the hyperlink under the Name column.
3. Click on Edit
The Edit Hyperlink dialog is displayed
4. Complete this dialog as outlined in Section 16.4.1, “ Adding Hyperlinks ”.
5. Move hyperlinks up and down the list using the Move Up and Move Down buttons, or by dragging
them to their new position in the list. This way you can prioritize a hyperlink to become the default
hyperlink that is followed when click on in the main navigation window.
Reviewing
234