2009

Table Of Contents
NOTE You can set the association with the design view when creating a drawing
view. The association with the design view can be changed after the drawing view
is created. When associations are set, it is possible to update the drawing view
automatically when changes are made to the assembly in the selected design view.
Creating Drawing Views
In this exercise, use the Drawing Views panel bar to create a base view,
projected view, and detail view for a tube and pipe assembly you previously
created. Pause the cursor over the images to view the tooltip.
The following figure shows the completed drawing views:
Creating Drawing Views | 185