Technical data
Estimating TR-55 Detention Basin Storage
53
To calculate the required storage volume for ponds
Steps
Use
to look up
1 Determine the pre- and post-development
watershed hydrological characteristics of the site.
2 Use one of the Hydrology runoff methods
described in the preceding topics to
determine the post-development peak inflow
discharge to the detention basin and the pre-
development peak outflow discharge from
the detention basin.
Overview of Calculating the
Runoff from the Watershed
Areas
3 From the Hydrology menu, choose
Routing ➤ Detention Basin Storage to display
the Detention Basin Storage dialog box.
Calculate the Required
Storage Volume for a
Detention Basin
4 Click the Data Input button or the Hydrograph
button to load an Inflow file. The InFlow File label
displays the name of the currently loaded file that
defines the Peak Inflow. This file can be a
graphical, tabular, or hydrograph file.
5 The Pond Name label displays the name of the
currently selected pond. Click the Pond button to
select an existing pond from the drawing.