2011

Table Of Contents
To:Click:
from the list that appears; the number in-
dicates how many render tasks in the list
are currently in progress. The progress bar
to the right of the render task name in the
list shows the task's progress: a blue bar is
displayed as the task progresses and is
completed successfully. A gray bar is dis-
played if the render task failed or was can-
celled (the text "failed" is also displayed if
a failure occurs). To remove a failed or
completed render task from the list, select
it, and then respond to the prompt for re-
moval. To cancel a task that is in progress,
select it, and then respond to the prompt
for cancellation. To delete a task in pro-
gress, first cancel it, and then delete it.
Displays the list of compositions that are
currently open. The name of the current
composition is displayed beside the icon.
If the user opens a composition version,
the version name appears to the right of
the composition name. The gray icon rep-
resents a read-write version, while a yellow
icon represents a read-only version. To
switch to a composition (or version), select
it from the list.
Open the Project Preferences window. The
current project is displayed beside the icon.
Open the User Preferences window. The
user name is displayed beside the icon.
Tools, Views & Pick List tabs
Tools and Views tabs display all the available tools you can add to
compositions, as well as the views you can display. Tools and views are stored
in their respective folders. When you click a tool category folder, the tools are
displayed in the lower portion of the panel.
30 | Chapter 3 Interface Fundamentals