2.0

Table Of Contents
Index
893
stge-storage curve data file format (.ssc),
538
data output. See outputting data, 605
daylighting
daylight lines, 405, 406
defining pond bottom, 105
daylighting, calculating, 72
DB format (import/export files), 708
dbf files, 723
define pipe runs, 652
polylines, 656
define ponds, 99
defining slopes. See also pond slopes,
102
from contours, 100
define subassemblies, 284
drawing the subassembly, 291
define templates, 301
deleting pipe runs (conceptual), 688
depth of flow in weirs
rectangular weirs, 525, 526
triangular weirs, 528
depth slope (cross sections)
benches, 351, 352
defining benches, 351
design control (cross sections), 326, 384
changing control values, 389
depth slopes, 326
ditches, 379, 381, 382, 383
editing, 341
match slope, 384
outputting control values, 375
slopes, 326, 347, 348, 349, 350
superelevations, 354
transitions, 343, 344
design pipe settings, 622
label settings (finished draft), 639, 643
layer settings, 636
pipe run editor, 630
pipe runs (defining), 633
slope and coefficient tables, 622
detention basins in ponds, 131
drainage area, 135
peak outflow, 135, 136
diameters in culverts, 489
ditches (cross sections), 338, 340, 379
ditch slope, 381
offset and depth, 383
width, 382, 383
ditches and transitions, 216
current layer, 216
defining as vertical alignments, 231
vertical alignment editor, 169
vertical alignment tangents, 216
vertical curves, 222
ditches and transitions (cross sections), 395
importing into profiles, 397
drafting settings, 639, 643
draw pipe runs, 652
finished draft, 702, 703, 704
drawing template (roadway cross sections),
270
edit cross sections, 384
changing control values, 389
changing slope control, 378
changing template control, 390
ditches, 379
identifying points, 386
match slope, 384
selecting a section, 386
viewing sections, 386
edit design control (cross sections), 341,
384
ditches, 346, 347, 379, 381, 382, 383
horizontal alignment transitions, 338
roadway transitions, 332
roadway transitions, 333
edit pipe run data (conceptual plan), 663,
670
upstream run flow data, 668, 669
edit pond outflow data, 155
edit subassemblies, 292
top surface, 298
vertices, 294, 295
edit templates, 307
connection points, 321, 322
point codes, 317, 318
roadway transitions, 332, 333, 338, 340
superelevations, 354
surfaces, 313, 314, 315, 322, 323
vertices, 311
edit vertical alignments (ground profiles)
creating existing ground data, 214
ditches and transitions, 235
generating vertical alignment reports,
173
vertical curves, 172
elevations (grading points), 5
stratum, 7
elevations in culverts
point from DTM surface, 492
elevations in ground profiles, 212
finished ground centerline, 211
elevations in roadway cross sections
labeling, 427, 429
elliptical pipe calculations