2.0

Table Of Contents
Chapter 7 Creating and Plotting Sheets Using Sheet Manager
742
3 Select a series.
The sheet is placed into model space over the plan view as a dotted or solid line
and numbered as the next sheet in the series. The corresponding profile
viewport is also shown on-screen.
The Edit Sheet View Definition dialog box is displayed.
4 Click the Move by Point< button. The Edit Sheet View Definition dialog box
closes.
5 Use your pointer to pick a new starting point for the view definition (based on
the leftmost edge of the view definition).
The view definition is moved to the new starting point and the Edit Sheet View
Definition dialog box is redisplayed.
6 In the Datum box, adjust the datum elevation of the view definition by typing a
value.
7 Click OK to exit the command.
8 To insert another sheet, click Insert Sheet Series again and repeat steps 17.
9 Click OK to save your edits and exit the dialog box.
NOTE
If you use this command before laying out the series, then the first view
definition area displays over the plan view of the current alignment as either
a dotted or solid line, and numbered as the first sheet in the series.