2.0

Table Of Contents
Chapter 6 Working with Pipes
686
Updating the Conceptual Pipe Runs in Plan View
Use the Check Plan command to update the pipe run:
n
After you edit the pipe run database in Microsoft Access, you can update the
graphical representation of the pipe run.
n
After you use AutoCAD commands to edit the graphical representation of the
pipe run, you can update the pipe run database.
NOTE
The plan and profile pipe runs are automatically updated with any changes
you make to the pipe runs in the Pipes Run Editor.
To update the conceptual pipe runs in plan view
1 From the Pipes menu, choose Conceptual Plan
รค
Check Plan to display the
Defined Runs dialog box.
2 Click OK to continue.
Editing Conceptual Pipe Runs in Profile View
Conceptual pipe runs are single line representations of plan and profile view
pipe runs. They serve as quick sketches of pipe run configurations, which you
can use to check a particular pipe run for proper position and location.
This section shows you how to do the following:
n
Edit conceptual pipe runs in profile view.
n
Delete conceptual pipe runs in profile view.
n
Edit conceptual pipe runs using the Pipe Run Editor.
n
Edit conceptual pipe runs in profile view using the Pipe Run Editor.
Editing Conceptual Pipe Runs in Profile View
Use the Edit Graphical (Conceptual Profile) command to graphically edit both
the pipes and the nodes of a selected conceptual pipe run in profile view. Use
this command after importing the conceptual pipe run with the Import Run
(Profile) command.
The following illustration shows a sample pipe run in profile view and selection
points on the pipe run for editing pipes and nodes:
Pipe run in profile view